ResinCore
(Recycled Epoxy Resin Flooring)

ResinCore
(Recycled Epoxy Resin Flooring)

ResiCore Flooring is an innovative and eco-friendly material based on epoxy resin. The core material is derived from pre-laminated panel offcuts that have not yet been processed into circuit boards. Through water separation technology, epoxy resin is extracted, ground into powder, and combined with MDI glue to produce the flooring core. This flooring core features exceptional waterproof performance, A2-s1 level fire-retardant, and zero formaldehyde emissions, making it a modern green building material that combines sustainability with high stability.

✓ Superior waterproofing ✓ Formaldehyde-free ✓ Fire-retardant ✓ High stability

Ordering Process

Design Selection

The customer provides design samples based on market demand, or we offer our best-selling designs for reference. (This step typically involves several rounds of confirmation: pattern → sample production → color adjustment → final pattern approval.)

Order Details

After the design is confirmed, the customer provides the quantity required for each size and pattern.

Proforma Invoice

We issue a Proforma Invoice (PI) to the customer and provide an estimated shipping date.

Deposit

The customer remits a 30% deposit.

Production

Production begins (approximately 35 to 40 days).

Final Payment

We provide the Commercial Invoice (CI) and confirm the container loading date with the customer. The remaining 70% balance must be paid before loading.

Container Loading

Container loading. On the Way to Your Market

Shipping Documents

We provide customs clearance documents to the customer.

Stable Order Workflow

For Long-Term Partnership Efficiency

  1. Order Details – Clear, Simple, Accurate
    The customer provides product requirements including design, size, and quantity. (If the customer wishes to develop a new design, Step 1 from the initial development process will be repeated.)
  2. Proforma Invoice – Confirming the Deal
    We issue a Proforma Invoice (PI) and provide the estimated shipping date.
  3. Deposit – Your Production Priority Begins
    The customer remits a 30% deposit.
  4. Production – Reliable Quality, On Schedule
    Production starts and takes approximately 35 to 40 days.
  5. Pre-Shipment Confirmation – Let’s Set the Date
    We provide the Commercial Invoice (CI) and confirm the container loading date with the customer.
  6. Container Loading – Ready for Departure
    Container is loaded and prepared for export.
  7. Flexible Balance – Smooth Payment, Smooth Process
    We provide the copy of the Bill of Lading (B/L).
    The customer pays the remaining 70% balance according to the CI.
    (While we encourage payment before loading, we remain flexible and do not enforce it.)
  8. Customs Documents – All Set for Final Delivery
    After export, we provide the necessary customs clearance documents to the customer.

Want to learn more?

Feel free to leave your contact information! We will get in touch with you as soon as possible and keep you updated with our latest products from time to time.

Scroll to Top